Skip to main content
Omneya Start test system Try it
Included in every subscription

Production & manufacturing

Bills of materials as production sets, production orders with work steps and quality checks, and material posted straight against your shared stock.

Omneya Produktionswesen, Modul-Tour
Film scenes created with AI. Learn more
Show transcript

You make your own products? Then every step counts.

Bill of materials, material, work steps. Scattered across notes and memory.

With Omneya, you create the bill of materials once and start the production order from it.

Your team works step by step, with quality checks and visible progress.

Materials are booked on completion. You see bottlenecks in advance.

Omneya. Request your test system now.

What it does

  • Production sets as bills of materials with quantity per unit
  • Production orders created by hand or triggered by sales orders
  • Work steps with templates: note, material pick, quality check, work instructions, pick list
  • Scanning at material pick by barcode, SKU, PZN or bin location
  • Pick list and work instructions as PDF with QR code
  • Consumption strategy: reservation or transfer to a production warehouse
  • Batch and best-before date per consumption and for the finished product
  • Dashboard showing component shortages

From set to finished product

In Omneya a bill of materials is called a production set: the finished item, its components and how much of each goes into one unit. From a set you create production orders for the quantity you need. You can do that by hand, or a sales order triggers the production order when the item sold is linked to a set. The pick list and work instructions come as PDFs with a QR code.

Work steps with quality checks

Every order is made up of steps, and there are five kinds: note, material pick, quality check, work instructions and pick list. When picking material, your team scans a barcode, SKU, PZN or bin location. A quality check can only be closed as passed or failed. Routines you use often are saved as templates, and a progress bar on the order page shows how many steps are done.

Post materials the way your workshop runs

The consumption strategy decides when material leaves stock. With reservation, Omneya posts it when the order is completed, although a pick step can be set to post earlier. With transfer, components move into a dedicated production warehouse as soon as the order starts. Batch and best-before date are recorded per consumption and for the finished product whenever the set requires them.

Shortages before they hurt

The production dashboard adds up the material needed by all open and running orders and compares it with available stock. Missing components appear in the "Component shortages" box, sorted by how much is missing.

Frequently asked about Production & manufacturing

Is Production & manufacturing included in the Omneya price?

Yes. Production & manufacturing is part of every Omneya subscription, with no extra charge, available from day one. All core modules are included in your chosen tier (Solo, Growth or Enterprise), you add extensions as needed. You can find the prices on the pricing page.

Which journey benefits from Production & manufacturing?

Production & manufacturing is especially relevant for: Merchant, Multi-Channel Pro, Ecosystem Architect. In the Omneya model every journey is supported by different modules, you choose the path, the system adapts.

Which modules pair well with Production & manufacturing?

Often used together: Warehouse and stocktaking, Purchasing, Batch management, Best-before date management, Articles. You can combine them and activate them at any time.

How do I try Production & manufacturing in Omneya?

In the free test system: we set up your own Omneya world with all modules active, including Production & manufacturing. You send a request, we review it personally, then your test system is ready in a few minutes. No credit card needed.

Technical profile

Status

Live

Interfaces

  • Warehouse : Components and finished products are posted against the shared stock.
  • Orders : Sales orders trigger production orders through linked sets.

Known limitations

  • Bills of materials have a single level; a set does not expand other sets inside it.
  • There is no capacity planning for machines, work centres or shifts.
  • No planning run creates production orders from minimum stock levels.
  • Batch and best-before date of the finished product are entered on completion, not inherited from the components.
  • There is no cost calculation per production order.
  • The consumption strategy applies to all orders alike.

Guides on this topic

Related modules

Suited to these journeys

Production & manufacturing shows its strength on these Omneya journeys in particular. Click in and see how it supports your world.