Zum Hauptinhalt springen
Omneya
EN
Start test system Try it

Manufacturing software for small business: every step in its place

Manufacturing software for small makers: bill of materials, production orders, work steps and quality checks, linked to stock and sales orders.

Film scenes created with AI.
Show transcript

You make your own products? Then every step counts.

Bill of materials, material, work steps. Scattered across notes and memory.

With Omneya, you create the bill of materials once and start the production order from it.

Your team works step by step, with quality checks and visible progress.

Materials are booked on completion. You see bottlenecks in advance.

Omneya. Request your test system now.

Manufacturing software for small business records what a product is made of, who makes it in which steps, and which materials leave the warehouse to do it. In Omneya you set up the bill of materials once as a production set, start production orders from it and work through them step by step, with quality checks and visible progress. Stock, sales orders and production all draw on the same inventory.

One bill of materials, any number of orders

A production set lists the components and how much of each goes into one unit. Every new production order works out the quantities for the batch size you need, and the pick list comes with it.

Steps with a proper check

An order is made up of work steps such as picking materials, a note or a quality check. A quality check can only be closed as passed or failed, with a comment when something looks off.

Bottlenecks before you start

The production dashboard adds up the material needed for all open and running orders and compares it with available stock. Anything short goes to the top of the list, sorted by how much is missing.

Say you sell a gift box with four items in it. Then an order for 60 boxes comes in, and suddenly people are asking whether there is enough ribbon left, who already folded the cartons and whether anyone wrote down the lot number of the soap. The answers are on a note at the workbench, in the head of whoever worked the morning shift, and in a spreadsheet nobody has touched since March. And since the soap was never booked out, the shop still lists bars that are already packed into boxes.

What does a production order look like in Omneya?

Here is the route from production set to finished product, in six steps.

  1. Create the production set. This is your bill of materials: the end product, its components and the quantity of each per unit. On the set you decide whether a lot number and an expiry date have to be recorded.
  2. Create the order. Pick the set and the quantity. Orders can also come from sales orders, when the item sold is linked to a set.
  3. Print the paperwork. The pick list and the work instructions come as PDFs, both with a QR code, so the order is back on screen in seconds at the workbench.
  4. Pick the materials. At the picking step your team scans a barcode, item number or storage location.
  5. Work and check. Steps are ticked off one after another. A quality check only closes as passed or failed.
  6. Complete. Enter the quantity produced, with the lot number and expiry date of the finished product if needed. The finished product goes into stock.

Routines you repeat often can be saved as a template for the work steps. There are five kinds of step: besides picking and quality checks, there are notes, work instructions and pick lists.

On the order page a bar shows how many steps are done, two out of four, for example, and below it which components have already been booked. When someone asks how far along Friday’s boxes are, you can answer without walking round the workshop.

When do materials leave the warehouse?

A single setting decides this, the consumption strategy. It applies to all orders.

With reservation, starting an order moves no stock. Materials are booked on completion, together with the finished product coming in. You can make one exception yourself: a picking step can be set to book as soon as it is ticked off.

With transfer, components move into a separate production warehouse when the order starts. They are gone from your sales stock straight away, which is more honest for long orders, because the shop stops offering them.

Which one fits depends on how long your orders run. If you finish in a morning, reservation works well.

Spotting shortages before they hurt

The production dashboard totals the material needed for every open and running order and compares it with the stock available. Wherever more is needed than you have, the component shows up in the bottlenecks box, with the biggest shortfall at the top. The count covers all warehouses together, so you see that ribbon is short and by how much, but not in which warehouse.

Production order software pays off sooner than most people expect. Once a bill of materials has more than three parts and more than one person works on it, you save yourself a lot of questions.

Where the limits are

Omneya does not schedule machines, workstations or shifts, and there is no run that creates production orders on its own from minimum stock levels. Bills of materials have one level. You enter the lot number and expiry date of the finished product yourself on completion; they are not carried over from the components. Cost calculation per order is not built in. If you run machine-based production you need a dedicated system, but for a workshop with ten people at the bench the scope is usually enough.

Try it in a test system with a set of three or four components and a small order, then look at stock to see what was booked. Every feature is listed on the production module page, and the inventory behind it under inventory and stocktaking. If the term ERP is still a bit vague, start with What is an ERP system?. Plans are on the pricing page.

Frequently asked questions

What is manufacturing software?

Manufacturing software manages bills of materials, production orders and work steps and connects them to your inventory. It tells you which materials an order needs, who is working on what, and when the finished product is in stock. In Omneya it is a module of the inventory system rather than a separate program.

When are materials taken out of stock?

That depends on one setting. With the reservation strategy nothing moves when an order starts, and materials are booked when the order is completed (unless you set a picking step to book them itself). With the transfer strategy the components move into a production warehouse as soon as the order starts.

Can a bill of materials contain another one?

No. A production set does not break down further sets inside it. If you need an intermediate product, you run a separate production order for it and use the result as a component in the next set.

Does Omneya schedule machines and shifts?

No. A production order holds the set, the quantity, the status and the start and completion times. Capacity planning for machines, workstations or shifts is not part of it.

Related

Last updated: October 2026

Try Omneya for free